Electrician Pull Meter Request

Electrician Pull Meter Request

If you are a Maine licensed electrician completing work that requires a simple service disconnect by temporarily removing the meter to complete work safely, you can now request below. Please complete this form for requests on single phase, single meter locations. We will complete an inspection and secure the meter and enclosure after the work is completed.

Form

Electrician Disconnect / Reconnect

Electrician Details

Required
Required
Required
Required
Required
Required
Required
Required
Required
If no Municipal or State Permit Number is required, please enter n/a
Required
Required
Choose an Option
Required

CMP Instructions and Expectations:

•    You have 15 calendar days from the start date entered above to perform the work.  After the 15th calendar day, CMP will visit the location to inspect the meter and meter enclosure, and to reseal the meter.  
•    You are expected to zip tie the meter enclosure shut when completed to ensure customer safety

<h2>CMP Instructions and Expectations:</h2> <p>•&nbsp;&nbsp; &nbsp;You have 15 calendar days from the start date entered above to perform the work. &nbsp;After the 15th calendar day, CMP will visit the location to inspect the meter and meter enclosure, and to reseal the meter. &nbsp;<br /> •&nbsp;&nbsp; &nbsp;You are expected to zip tie the meter enclosure shut when completed to ensure customer safety</p>

Please check each of the following acknowledgements before disconnecting the CMP meter:

<p><strong>Please check each of the following acknowledgements before disconnecting the CMP meter:</strong></p>
Required
Required
Required
Required
Required
Required
Required
Required

In case of emergency that requires electric service to a customer’s premises to be disconnected call

<p>In case of emergency that requires electric service to a customer’s premises to be disconnected call</p>
Required